Böker Magnum Long Lead EDC 01SC080
Code: 01SC080Related products
Product detailed description
No product's description available
Additional parameters
Category: | Folding knives |
---|---|
Knife type: | Folding |
Blade length category: | 8,00 - 8,99 cm |
Steel type: | Stainless steel |
Blade material: | 8Cr13MoV |
Handle material: | G10 |
Lock type: | Slipjoint |
Sheath: | no sheath |
Overall length: | 18,4 cm |
Blade length: | 8 cm |
Blade thickness: | 2,7 mm |
Weight of knife: | 78 g |
Blade shape: | Drop Point |
Blade finish: | Satin |
Blade grind: | Flat |
Be the first who will post an article to this item!
Be the first who will post an article to this item!
Böker has a long history dating back to the end of the 17th century, when a German manufacturer of work tools was promoted to a manufacturer of swords and knives. Since then, the company has developed from its roots in Germany and currently produces various brands around the world.
The Magnum by Böker brand manufactures its knives in Taiwan and China and provides Böker reliability and unique design with a focus on maintaining favorable prices. Magnum by Böker knives are designed for casual wear and work, with an elegant design and affordable prices. Unrivaled price / quality / performance ratio, that's Magnum by Böker.